Skip to main content

Deliverable & Report Timeline

Standard Deliverables

Each GrintOps service includes standardized outputs depending on the tier and scope.

🔐 Security Engineering

  • VAaaS (Vulnerability Assessment)
    PDF/HTML report with CVSS scoring, affected components, and remediation steps.

  • PTaaS (Penetration Testing)
    Technical & executive report, risk prioritization, attack path simulation (PDF/HTML), retesting summary (Pro+ only).

  • PSaaS (Phishing Simulation)
    Campaign summary, open/click report, awareness scoring, learning material download (PDF/CSV/JSON).


⚙️ Platform Engineering

  • DOaaS (DevOps as a Service)
    CI/CD architecture diagram, config audit summary, deployment logs (Pro+), IaC validation result.

  • DSOaaS (DevSecOps)
    Code scan results (SAST/DAST), container image scan, supply chain risk summary, GitOps security posture report.

  • COaaS (CloudOps)
    Infrastructure provisioning logs, resource inventory (PDF/Excel), monitoring config snapshot, policy enforcement summary.


🧩 Products

  • OSaaS (Open Source as a Service)
    • For Business Stack: Admin guide, initial config, permission matrix (PDF).
    • For Infra Stack: Deployment log, user access notes, hardening checklist (Enterprise only).

Timeline by Service

ServiceDelivery SLA
VAaaS2–4 working days
PTaaS3–5 working days
PSaaS1–3 working days
DOaaS3–7 working days
DSOaaS5–7 working days
COaaS3–5 working days
OSaaS1–2 working days post-setup

Note: SLA applies after onboarding, provisioning, and access have been completed by the client.